A step-by-step plan for a warmer, healthier, lower-energy period home





Making an old house warmer isn’t one job, it’s a sequence: insulation, airtightness, ventilation, windows, heating and solar. Done in the wrong order, the steps can undo each other or trap moisture where it causes damage. A retrofit plan sets out the right order for your house, so each piece of work builds on the last, whether you do it all at once or over ten years.

What’s in a plan
  • A detailed look at how your house is built and how it’s performing now, using bills, measurements and smart meter data where available
  • Energy modelling to compare options and show what each step is worth
  • Moisture and ventilation risks checked before anything is sealed up
  • Measures prioritised and phased around natural moments, such as a new roof, a boiler failing, an extension or a change of tenants
  • Rough costs and expected savings for each step
  • Heat pump and solar readiness, so earlier work doesn’t block later steps
  • Where your house is listed or in a conservation area, what needs consent


Guidance I work toI use recognised targets as a benchmark, including LETI’s Climate Emergency Retrofit Guide and AECB standards, adapted to the realities of traditional buildings using Historic England and STBA guidance. The aim is the best performance your house can reach without harming it, rather than a target it was never built to meet.

Proof, from our own houseWe did this to our own Victorian terrace, A-Typical Terrace, and then measured it for a year. Our heating bills are now about £10/month, with money to spare, and you can see predicted against actual performance in A Year in Our Retrofit.

Common mistakes

  • Insulating without thinking about ventilation. A more airtight house needs a plan for fresh air and moisture, or condensation and mould follow.
  • The wrong insulation on solid walls. Old walls need to dry out. Some modern materials stop them doing that.
  • Doing things out of order. For example, new windows fitted before the walls are insulated, leaving a cold edge where they meet.
  • Sizing heat pumps by guesswork. A good plan sizes heating for the house you’ll have after the improvements, not the one you have now.


Where to startIf you’re not sure what your house needs yet, start with an Old House Health Check. If you know you want to make your home lower-energy and want a clear route, a retrofit plan is the next step.

Talk to me about a retrofit plan ︎︎︎